- December 19: GM Transmission Class Action Lawsuit Update: Appeals Court Ruling news | 3 days ago
- December 3: GM Truck Tailgate Recall Involves 150,000 HD Trucks recalls | 19 days ago
- November 17: Chevy Express and GMC Savana Vans Recalled For Multiple Issues recalls | 35 days ago
- November 13: GM Recalls 514,000 Vehicles After Rear Wheels Lock-Up recalls | 39 days ago
- October 26: Recall: 2024 GMC Canyon Headlights Flicker recalls | 57 days ago
GMC Preliminary Evaluation PE09044: Interior Door Handle Laceration Risk
2007 GMC Yukon
Interior Door Handle Laceration Risk
Latches/Locks/Linkages:Doors:Latch
Structure:Body:Door
- Summary
- The statistical data regarding problem experience in the table above are net counts for unique vehicles.Review of information in this PE discloses that while accounting for approximately two-thirds of the total population, MY 2007 subject vehicles are cited in more than 90 percent of the consumer complaints, injury reports, and warranty claims, respectively.In addition, improvements in the door handle manufacturing process during the MY 2007 production resulted in a decline in the occurrence of peeling/flaking of the thin chrome plating.Other environmental factors were also identified that may have influenced the occurrence of the condition which poses the alleged safety risk.Additional analysis is required to identify the specific vehicles most susceptible to peeling or separation of the chrome plating from the handle, and to assess the significance of its occurrence.This PE has been upgraded to an Engineering Analysis to facilitate further study.
- Documents (12)
- OPENING RESUME APPROVED * 09/14/09 * p
- OCC 4/30/2010 LETTER TO GM GRANT CONFIDENTIAL TREATMENT TO GM 3-11-2010 LETTER TO OCC
- GM 3-11-2010 LETTER TO OCCREQUEST FOR CONFIDENTIAL TREATMENT
- CLOSING RESUME APPROVED
- IR TO MFR - To investigate allegations of a laceration hazard resulting from sharp edges in the chrome plating on the interior door handles of certain vehicles sold by GM. * 09/18/09 * p
- GM 11/6/2009 ATTACHMENT Q8
- GM 11/6/2009 LETTER TO ODI
- GM 11/6/2009 ATTACHMENT Q3
- GM 11/6/2009 ATTACHMENT Q9
- MFR IR RESPONSE DATA
- MFR IR RESPONSE DATA
- GM 11/6/2009 ATTACHMENT Q3 REQUEST NUMBER 2 DATA
Click a tab for more information.