- July 5: Chevrolet Bolt Battery Fire Recall Failed For 84 Vehicles recalls | 17 days ago
- July 4: Chevrolet Colorado and GMC Canyon Recalled For Fire Risk recalls | 18 days ago
- July 4: GM Recalls 2024 Chevrolet Blazer Electric Vehicles Over Control Issues recalls | 18 days ago
- July 2: No Missouri GM Oil Consumption Class Action Lawsuit news | 20 days ago
- June 14: Chevrolet Corvette Recall Issued Over Seat Belt Problems recalls | 38 days ago
Chevrolet TSB #PIP5345A
2015 Chevrolet Tahoe
TSB Document:
Affected Component: POWER TRAIN
- Summary
- This Preliminary Information communication provides information to the technician about being to achieve pre-load when setting up the pinion bearing pre-loads during reassembly of the 9.5/9.76 inch rear axles. Technician will need to use pinion gear install washer part number 11609638 onto the pinion shaft between the flange and nut. Tighten the pinion nut until you achieve 10 pound inch or 1.0 newton rotating torque. After the torque has been achieved back the nut off and remove the washer. Tighten the nut back down until you achieve 15 pound inch or 1.7 newton meters for used bearings or 20 pound inch 2.25 newton meters for new bearings.
Click a tab for more information.