- November 13: GM Recalls 514,000 Vehicles After Rear Wheels Lock-Up recalls | 16 days ago
- November 6: Another Chevy Bolt Battery Fire Recall recalls | 23 days ago
- October 28: Chevrolet Recalls Blazer and Equinox Over Door Strikers recalls | 32 days ago
- October 12: GM Vortec Oil Consumption Lawsuit Dismissed news | 48 days ago
- October 8: Enel X Way Closure and JuiceBox Charger Fires Investigated investigations | 52 days ago
Chevrolet TSB #PIP5345
2015 Chevrolet Silverado 2500
TSB Document:
Affected Component: EQUIPMENT ADAPTIVE/MOBILITY
- Summary
- This Preliminary Information communication provides information to the technician about being to achieve pre-load when setting up the pinion bearing pre-loads during reassembly of the 9.5/9.76 inch rear axles. Technician will need to use pinion gear install washer part number 11609638 onto the pinion shaft between the flange and nut. Tighten the pinion nut until you achieve 10 pound inch or 1.0 newton rotating torque. After the torque has been achieved back the nut off and remove the washer. Tighten the nut back down until you achieve 15 pound inch or 1.7 newton meters for used bearings or 20 pound inch 2.25 newton meters for new bearings.
Click a tab for more information.