- September 21: GM Brake Fluid Warning Light Problems: 488,000 Vehicles Recalled recalls | 43 days ago
- September 2: GM Transmission Class Action Lawsuit Continues After Appeal news | 62 days ago
- August 16: Cadillac LYRIQ Recall Says Brakes May Fail recalls | 79 days ago
Cadillac Preliminary Evaluation PE03050: FUEL RAIL LEAKAGE
1997 Cadillac Eldorado
FUEL RAIL LEAKAGE
Fuel System, Gasoline:Fuel Injection System:Fuel Rail
- Summary
- The fuel rail assemblies used in the subject vehicles were manufactured by dana.the fuel rail jumper tubes were made of monolayer nylon 12 (PA12).in model year (MY) 1998, the jumper tube material was changed from PA12 to M-bond (a multi-layer ptfe/PA12).in addition, all service parts produced since the end of production 1997 use the M-bond jumper tubes. Material analysis performed by dana on failed fuel rails showed that the mono-layer nylon 12 jumper tubes are susceptible to environmental stress cracking (ESC).GM believes the ESC is a result of heat, time, alcohol blended fuel, fuel pressure cycling, and designed in stress. Eight of the GM complaints are duplicative of ODI complaints.ODI has received 77 of it's 123 complaints in the past 12 months.fuel rail part sales over the last three years range from 3.0 percent of production for the MY 1997 Cadillac vehicles to 13.1 percent for the MY 1995 Aurora.at least one of the fire incidents occured while the vehicle was parked within a garage attached to the consumers home.the fire resulted in damage to the dwelling as well as the total loss of the vehicle.this investigation has been upgraded to an engineering analysis.
- Documents (21)
- CLOSING RESUME 2/3/04
- MEMO 1/8/04 TO TIS, ONE CD GM 1/8/04 ATTACHMENT 1
- GM 4/13/2004 LETTER TO OCC, REQUEST FOR CONFIDENTIAL TREATMENT
- OCC 8/20/2004 CONFIDENTIAL TREATMENT TO GM 4/13/2004 LETTER TO OCC
- IR TO MFR
- OPENING RESUME DATED 10/30/03
- GM 1/8/04 ATTACHMENT 2A, BOOK 1 OF 4
- GM 1/8/04 ATTACHMENT 2D, PART 2 OF 4, BOOK 4 OF 4
- GM 1/8/04 ATTACHMENT 2D, PART 3 OF 4, BOOK 4 OF 4
- GM 1/8/04 ATTACHMENT 2D, & 2E IS THE LAST 2 PAGES, PART 4 OF 4, BOOK 4 OF 4
- GM 1/8/04 RESPONSE LETTER, 4 BOOKS
- MEMO 5/13/04 TO TIS, ONE CD GM 5/13/04 ATTACHMENT 1
- GM 1/8/04 ATTACHMENT 2A PART 1 OF 2, BOOK 2
- GM 5/13/04 LETTER TO ODI
- GM 1/8/04 ATTACHEMTN 2B, PART 2 OF 2, BOOK 2 OF 4
- GM 8/11/2005 LETTER TO ODI, RECEIVED IN ODI 8/15/2005
- LETTER TO GM FROM OCC GRANT CONFIDENTIAL TREATMENT TO GM 8/11/05 LETTER TO OCC
- GM 8/11/05 LETTER TO OCC REQUEST FOR CONFIDENTIAL TREATMENT TO
- GM 1/8/04 ATTACHMENT 2C PART 1 OF 4, BOOK 4 OF 4
- GM 1/8/04 ATTACHMENT 2A, PART 2 OF 2, BOOK 2 OF 4
- GM 1/8/04 ATTACHMENT 2B, PART 1 OF 2, BOOK 2 OF 4
Click a tab for more information.