TSB Document:

Affected Component: POWER TRAIN

Summary
This Preliminary Information communication provides information to the technician on the step to replace the power steering cooler. Technician will need to block off the hoses near the cooler connection with appropriate clamps. After the hoses are clamped disconnect the cooler from the lines and remove the cooler. Before installing the new cooler prefill the new cooler on the bench and cap off the pre-filled cooler ends for installation. When the new cooler is installed remove the clamps on the hoses and follow the service information for Power Steering System Bleed Procedure.

Click a tab for more information.

Date Published
JAN 08, 2015
NHTSA TSB #
10114335
Find something helpful? Spread the word.

Become a Fan & Spread the Word